To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 16174
16173  |  16175
Subject: 
Re: Under Hanging Train Idea: v1 Concept design
Newsgroups: 
lugnet.trains
Date: 
Fri, 19 Apr 2002 00:00:37 GMT
Viewed: 
521 times
  
In lugnet.trains, Frank Filz writes:

You would only be able to go through the points one direction since they
need to be switched to the diverging track in order for the power to be
transmitted from the diverging track to the straight track.

Yep.



Message is in Reply To:
  Re: Under Hanging Train Idea: v1 Concept design
 
(...) You would only be able to go through the points one direction since they need to be switched to the diverging track in order for the power to be transmitted from the diverging track to the straight track. Frank (22 years ago, 18-Apr-02, to lugnet.trains)

28 Messages in This Thread:














Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR