Message has 2 Replies:  | | Re: SuperTrain 2001 layout latest
|
| (...) Whoops! I didn't pay enough attention the first time around... The baseplates should be lined up with the inside, not with the outside of the tracks, if that makes sense - there's an extra 8 studs of baseplate on the outside of this: (TD (...) (24 years ago, 25-Jan-01, to lugnet.org.ca.nalug)
|
Message is in Reply To:
 | | Re: SuperTrain 2001 layout latest
|
| Here's a close-up of mountain spacing, with the "incline corner-stone reference" highlighted. I moved the "industrial loop" closer in to (URL) mountain because this way the mountain and loop have a 4'x10' table area. Let's the mountain spread out (...) (24 years ago, 24-Jan-01, to lugnet.org.ca.nalug)
|
91 Messages in This Thread:   
                
        
            
          
          
                    
                     
              
                      
               
             
                
           
         
      
                   
       
         
             
                   
               
             
             
         
             
           
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|