To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.nalugOpen lugnet.org.ca.nalug in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / NALUG / 459
458  |  460
Subject: 
Re: SuperTrain 2001 layout - Switching Yard
Newsgroups: 
lugnet.org.ca.nalug, lugnet.trains
Date: 
Fri, 5 Jan 2001 20:37:41 GMT
Viewed: 
2636 times
  
In lugnet.org.ca.nalug, Steve Chapple writes:
I'm posting this also in the main trains group in case someone has
indeed cut the edge off some switches or found a way to make a
switching yard close together like this.  I'm going to try an interleaved
yard to get the tracks the way I want - I'll post a shot of the results.

I killed the whole morning (I could never do this with a regular paying
job) making it, but I've got a switching yard that I like.  The overall
"industrial end" is 8'x18', with the yard 3' across.  (Any wider and we
wouldn't be able to reach it properly.)  LMK what you think.
http://www.brickshelf.com/cgi-bin/gallery.cgi?i=26059
Yes, the piece count is correct - and I'm not even done
yet.  I think I'm going to need more track loans...  8-)

SRC
StRuCtures



Message has 2 Replies:
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) Er, one of the tracks isn't connected. So, thats 1173 pieces of train track. My guess is about a minute to place each one. Some as little as a couple seconds, but overall, I think that's a not unexpected rate. That's a *lot* of time! P.S. I've (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) (URL) shot is of the "industrial side" with the switching yard and the container, oil and auto depots/yards. The empty spot in the lower corner is for hand-outs - there's a matching one on the "town side". SRC StRuCtures (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)

Message is in Reply To:
  Re: SuperTrain 2001 layout - Mountain Switching
 
I'm posting this also in the main trains group in case someone has indeed cut the edge off some switches or found a way to make a switching yard close together like this. I'm going to try an interleaved yard to get the tracks the way I want - I'll (...) (24 years ago, 5-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)

91 Messages in This Thread:



























Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact

This Message and its Replies on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR