Subject:
|
Re: Finally...
|
Newsgroups:
|
lugnet.trains
|
Date:
|
Wed, 14 Nov 2001 17:27:00 GMT
|
Viewed:
|
444 times
|
| |
| |
In lugnet.trains, James Powell writes:
> I've actually completed the joining loop on my new fixed layout. Something in
> excess of 300 straight track, 1 3/4 circles+, 2 switches, 47" vertical, 5 holes
> in walls later, I can get trains from the lower level to the upper level.
Goodness! This I *have* to see.
--
Tony Hafner
www.hafhead.com
www.pnltc.org
|
|
Message is in Reply To:
| | Finally...
|
| I've actually completed the joining loop on my new fixed layout. Something in excess of 300 straight track, 1 3/4 circles+, 2 switches, 47" vertical, 5 holes in walls later, I can get trains from the lower level to the upper level. Max load appears (...) (23 years ago, 14-Nov-01, to lugnet.trains)
|
10 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|