To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.spaceOpen lugnet.space in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Space / 31517
31516  |  31518
Subject: 
Re: Moonbase at Brickfest... how was it planned?
Newsgroups: 
lugnet.space
Date: 
Thu, 26 Feb 2004 15:43:56 GMT
Viewed: 
584 times
  
In lugnet.space, David Laswell wrote:
In lugnet.space, Huw Millington wrote:
Thanks for the lowdown...  We have done moonbases before but not with
monorail. I was thinking of planning a grid, say 5 x 10 48x48 baseplates,
working out a monorail layout around it, then asking prospective
participants to specify which baseplate area(s) they wish to occupy in
advance. Some could choose ones with monorail track on it, and others ones
without to suit their preference. I believe a lot of participants will be
building modules especially for the event, so while it'll need a lot of
organisation beforehand, it might just work...

Unless you're prepared to fill in gaps with some scratch-built corridors, I'm no
sure how feasible this will be.  The idea of designing the module layout around
the Monorail layout is interesting, but I suspect you'll find that you need to
be really flexible about where specific modules get placed.  If you do end up
running with this idea, you might want to ask for pre-built modules to be placed
first and then try to get people to claim gaps for modules that they plan to
build.

I think it would make a lot more sense to have 3 or 4 standards. And then you
can shuffle the bases about any way you like and still have everything work
together. You could run your track any way you want within your base as long as
it comes out at the standardized spots. Jon and them are working on clearance
standards as well. So all the trams, trains, etc, can run through the entire
base without problems.

--SteveR



Message is in Reply To:
  Re: Moonbase at Brickfest... how was it planned?
 
(...) Unless you're prepared to fill in gaps with some scratch-built corridors, I'm no sure how feasible this will be. The idea of designing the module layout around the Monorail layout is interesting, but I suspect you'll find that you need to be (...) (20 years ago, 26-Feb-04, to lugnet.space)

13 Messages in This Thread:





Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR