To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.legoOpen lugnet.lego in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 LEGO Company / 188
187  |  189
Subject: 
Re: Larry Tells All... (was Re: Lego To Close Molding, etc.)
Newsgroups: 
lugnet.lego, lugnet.general
Date: 
Wed, 29 Nov 2000 20:28:16 GMT
Viewed: 
2085 times
  
In lugnet.lego, Selçuk Göre writes:


richard marchetti wrote:

Larry Pieniazek writes:
<<I'm guessing.>>

'nuff said.

-- Richard

But he is guessing just right. an automatic injection molding machine
does not require a full time operator. One operator could easily oversee
20-30 machines, with enough automation is utilized, and I know Lego is
very good at that.

Selçuk

I'll add in here, that I was guessing.  I was figuring around 5
machines/operator, and a fair overhead/support.  For example, if you don't have
any production, you don't require _any_ QA.  Also, if you figure 500 machines
(a possible number, but I think rather high), then you are talking between
10-50 people/shift (50 is too many, for a continous process, with only 94
workers).  What I did was roughly, divide into 3 (33/shift) then subtract 13
(for Management/Janitors/maintance mechanics(very possibly low) (gives 20), so
you have about 20 people directly involved in molding/QA/ _printing_ (I am
assuming that some printing is done in Enfield too...I know that when
Sampsonite had the Canadian operation, printing was done...).  So, by giving
each person 2.5 machines (probably low, as Larry says, but I doubt 5K machines
either :), you get 10 people/shift directly operating machines (feeding
plastic,changing molds,ect.)  My experience is mostly through what my dad has
said about packaging medicines (for NuPharm and Organon, if you are wondering),
and they had _every_ machine manned all the time.  Lego claims to have very
high QA, so would likely have the same sort of standards...at least, I think
they _used_ to.

I also don't know how often the molds are changed (a big issue in
downtime/manning) or PM (or even shifting...if there is one shift, then more
machines operated for less time...), and I would certanly consider Larry's
statement (of 100-500 machines) to be in the relm of possible...5K, well, I
doubt that...

James P



Message has 1 Reply:
  Re: Larry Tells All... (was Re: Lego To Close Molding, etc.)
 
(...) Unlike people who take potshots at others for guessing, you and I are both extrapolating from insufficient data, but nevertheless still providing valuable insight because we're trying to be useful. One area of the data that is particularly (...) (24 years ago, 29-Nov-00, to lugnet.lego, lugnet.general)

Message is in Reply To:
  Re: Larry Tells All... (was Re: Lego To Close Molding, etc.)
 
(...) But he is guessing just right. an automatic injection molding machine does not require a full time operator. One operator could easily oversee 20-30 machines, with enough automation is utilized, and I know Lego is very good at that. Selçuk (24 years ago, 29-Nov-00, to lugnet.lego, lugnet.general)

43 Messages in This Thread:

















Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact

This Message and its Replies on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR