To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trains.orgOpen lugnet.trains.org in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / Train Organizations / 129 (-10)
  NGLTC early pics from Greenbery Show
 
Hey the show is going great, the larger layout has made life so much easier. Here are a few early pictures from todays show, later this week I'll have some more overview pics and such. (URL) (27 years ago, 3-Oct-99, to lugnet.trains, lugnet.trains.org)
 
  NGLTC at the Greenberg Toy Show
 
The North Georgia LEGO Train Club will be presenting at the North Atlanta Trade Center, on October 2-3. We are having a layout of about 18'x 12'. This time we will have a nice digital camera on hand, so we can finally get some pictures up on our (...) (27 years ago, 23-Sep-99, to lugnet.trains.org)
 
  from RTL ... a roundhouse
 
copied from RTL Subject: Engine Roundhouse Date: Thu, 09 Sep 1999 09:25:28 +0200 From: Reinhard Beneke <r.beneke@tu-bs.de> Organization: TU Braunschweig, Germany To: r.beneke@tu-bs.de Newsgroups: rec.toys.lego Hi all! I've just finished modelling a (...) (27 years ago, 9-Sep-99, to lugnet.trains, lugnet.trains.org)
 
  Re: tables (wasFirst Meeting of NOVALTC!
 
The 6-tracklength width of the tables is indeed a fundamental issue as it essentially determines the number of parallel lines without adding extra tables. Member Will Chapman used gargantuan 40x90inch tables for a few years before PNLTC formed. At (...) (27 years ago, 31-Aug-99, to lugnet.trains.org)
 
  Re: Transitional piece construction
 
(...) Hi again, had a better idea you still need to make to insulated joint but at each joint you only need to put scoth tape on one side of the track: see the other ascii art trial | | A | | | = -> insulation | | | | | | middle section | | = |-> (...) (27 years ago, 25-Aug-99, to lugnet.trains.org)
 
  Re: Transitional piece construction
 
(...) that will works but you will need 2 joint like that because when to train motor will cross over the joints both front and rear wheels are connected and will short-ciruit the 2 modules (also bad ascii art) A B ====~====~==== ^ ^ | | | | joint (...) (27 years ago, 25-Aug-99, to lugnet.trains.org)
 
  Re: Transitional piece construction
 
(...) I'm not 100% pure. So I would use sticker edges between rail joints to insulate. Or just mount the track one stud apart, that makes a fine gap. (...) Why? You just need two switches back to back, like so (bad ascii art) A2---\ (...) (27 years ago, 24-Aug-99, to lugnet.trains.org)
 
  Transitional piece construction
 
How would you connect 2 different LTC layouts together when the way the transformers and therefore power distribution is different? If you did a straight connection then one group would control the others trains. The solution I thought of was to (...) (27 years ago, 24-Aug-99, to lugnet.trains.org)
 
  Re: First Meeting of NOVALTC!
 
(...) ...Hmmmm... The folding legs would be nice, may have to investigate once I get the initial tables built. My observation at the moment is how to make track loops on it. The width of the table is just at the curvature of the track, so I'm having (...) (27 years ago, 22-Aug-99, to lugnet.trains.org)
 
  Re: First Meeting of NOVALTC!
 
PNLTC Tables - if you guys want to chat send us some mail. Ben Fleskes designed the tables and there has been several revisions. The size of the tables and the hole patterns on the side to bolt them together has remained the same as original plan (...) (27 years ago, 20-Aug-99, to lugnet.trains.org)

Next Page:  5 more | 10 more | 20 more
Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR