To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 252
251  |  253
Subject: 
Re: 1999 Trains
Newsgroups: 
lugnet.trains
Date: 
Tue, 8 Dec 1998 23:57:35 GMT
Viewed: 
1268 times
  
Matthew Bates writes:
As for the cherry picker, anyone know what that signal is supposed to be? I've
never seen one like that. And what is that little black bit sticking up above
the black 2x2 plate near the top?

The 2x2 plate toward the top of the signal is actually a hinged piece (parts#
2429 & 2430). It looks like one 1x2 side is attached below the 1x2 trans red
piece.  The other side of the 2x2 probably swings up (to make a 1x4 piece)
covering the red and revealing a trans green piece.



Message is in Reply To:
  Re: 1999 Trains
 
(...) by (...) If it wasn't for this piece, I'd still be worried, I don't see a single new piece in the other two sets. As for the cherry picker, anyone know what that signal is supposed to be? I've never seen one like that. And what is that little (...) (26 years ago, 7-Dec-98, to lugnet.trains)

10 Messages in This Thread:




Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR