To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 16168
    Re: Under Hanging Train Idea: v1 Concept design —Frank Filz
   (...) You would only be able to go through the points one direction since they need to be switched to the diverging track in order for the power to be transmitted from the diverging track to the straight track. Frank (23 years ago, 18-Apr-02, to lugnet.trains)
   
        Re: Under Hanging Train Idea: v1 Concept design —Larry Pieniazek
     (...) Yep. (23 years ago, 19-Apr-02, to lugnet.trains)
   
        Re: Under Hanging Train Idea: v1 Concept design —Ross Crawford
   (...) If you arranged it as a passing loop, with power to the passing track, you could have one of the switches straight depending on which way it was going. Possibly even work out an automatic control that switched them depending on the direction (...) (23 years ago, 19-Apr-02, to lugnet.trains)
   
        Re: Under Hanging Train Idea: v1 Concept design —Ross Crawford
   (...) And I just thought, doesn't power still get through to the straight track as the loco passes a "reversed" switch in the wrong direction and pushes the switching rail out of the way? I had an idea the switching of power was done with trickery (...) (23 years ago, 19-Apr-02, to lugnet.trains)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR