| | Re: min/max distances for track wiring
|
|
(...) Or, just electrically isolate the two sections, so each transformer is powering its own section of track. The easiest way is to leave a 1 stud gap between two lengths of straight track, and use a 4x8 plate to tie (no pun intended!) the tracks (...) (24 years ago, 8-Jan-01, to lugnet.trains)
|
|
| | Re: More ramblings about the train contest
|
|
(...) Come on. There are some very talented people working for LEGO who can design what ever they feel like designing. Unfortunately, it does not seem like any of those talented people work in marketing. Chris (24 years ago, 8-Jan-01, to lugnet.trains)
|
|
| | New Observation car
|
|
Even though I said that I wouldn't be doing any coach work for a while, I built an observation car. It is almost done, but I decided to put up three preliminary pictures anyway. I need to buy some doors, some windows, and a few chairs to finish it (...) (24 years ago, 7-Jan-01, to lugnet.trains)
|
|
| | Re: min/max distances for track wiring
|
|
(...) If you put a loop on 60 feet table a suggest that you put your transformer about in the middle of the table and set 1 connection on boot side of the loop at that point (about 3-4 feet apart across the table), by doing so you cut the length of (...) (24 years ago, 7-Jan-01, to lugnet.trains)
|
|
| | min/max distances for track wiring
|
|
Hello, I was wondering if you could share your experiences with our group. How often, either in track pieces or actual measured length do you add an electrical connection to your long lengths of track? Is it better to hook up transformers at (...) (24 years ago, 7-Jan-01, to lugnet.trains)
|
|
| | Re: SuperTrain 2001 layout - Switching Yard
|
|
I agree with John, that it would be best if you had atleast two separate loops of track. (I still like Chris' "law" that the continuous loop(s) not run along the branch of a switch.) With a layout that size, if only one locomotive can run at a time, (...) (24 years ago, 7-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
|
|
| | Re: Santa Fe locomotive - (rev. 3 - final?)
|
|
"Mike Walsh" <mike_walsh@mindspring.com> wrote in message news:G6E5t7.A6H@lugnet.com... (...) [ ... snipped ... ] I have iterated on my Santa Fe Warbonnet locomotive again. Added an interior, moved one of the SNOT coupling locations so it isn't (...) (24 years ago, 7-Jan-01, to lugnet.trains)
|
|
| | Re: More ramblings about the train contest
|
|
Well, I will probably get Flamed over this but, oh well. I finally got my catalog yesterday and read the Train contest. Sounds to me like they can't build quality trains so they need someone else to do it for them (just look at the last two trains). (...) (24 years ago, 7-Jan-01, to lugnet.trains)
|
|
| | Re: More ramblings about the train contest
|
|
(...) Probably not all that exciting. I said my piece already. I do market my designs (www.miltontrainworks.com) and I consider results so far a modest success but not a huge one. I also said that while I personally won't be entering I can see merit (...) (24 years ago, 7-Jan-01, to lugnet.trains)
|
|
| | Re: More ramblings about the train contest
|
|
(...) Hmmm - Larry vs. Tony - This could be interesting. 8-) SRC (24 years ago, 7-Jan-01, to lugnet.trains)
|