To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.technicOpen lugnet.technic in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Technic / 15850
15849  |  15851
Subject: 
Re: Two New GBC Modules..
Newsgroups: 
lugnet.technic
Date: 
Wed, 15 Aug 2007 14:54:48 GMT
Viewed: 
9583 times
  
I built it last night. My earlier problem was in trying to use 4-stud axles to hold the pulleys in their offset position -- this is hard to describe, but the gist of it is the axles sometimes got in the way of other pulleys and warped their position. This time I started with every pulley on a single 12-stud axle (not using the center hole), and then I used 2-stud axles between every pulley to make the offset.



Message is in Reply To:
  Re: Two New GBC Modules..
 
(...) It's hard to tell from that picture, but pause the video and you'll see the balls run up at a 6-stud spacing. That means the peaks of the wave are six studs apart. The cams are spaced with one pulley plus a half bush, so are spaced exactly one (...) (17 years ago, 14-Aug-07, to lugnet.technic, FTX)

10 Messages in This Thread:



Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR