Subject:
|
Re: I'm always asking questions regarding the layout...
|
Newsgroups:
|
lugnet.org.ca.vlc
|
Date:
|
Tue, 31 Oct 2000 21:40:07 GMT
|
Viewed:
|
1029 times
|
| |
| |
Kevin Wilson wrote:
> Robin Sather wrote:
> > Ditto on the monorail track for me. Also, I now have the 3 short
> > directional control pieces needed for our layout, so Kevin won't need
> > to help there. I'll provide all the monorail track and connectors.
> > I've got lots of supports, but probably not quite enough, depending on
> > the rest of the supports in the layout (stations, mountain, top of
> > train bridge, etc.)
>
> OK. DId you say you were short of ramps, Robin? I can bring those if
> needed. It also strikes me that we need another directional control
> piece - at the m-station by the docks, BOTH sides of the loop ought to
> have a control switch so we can stop one train on one side, and start up
> teh one that was previously stopped on teh other side. I have 2 I can
> bring if required.
If we can come up with a switch and push system I could make a program that
would send each monorail out and wait for it to return before sending the
OTHER one...
I've always been annoyed with the fact that the monorails SNAP back without
waiting at the station...
Dean
--
Coin-Op's For Sale!: http://www.akasa.bc.ca/tfm/coin-op.html
Dean's Lego Workshop: http://www.akasa.bc.ca/tfm/lego_wr.html
Vancouver Lego Club: http://www.akasa.bc.ca/vlc
|
|
Message has 3 Replies:
Message is in Reply To:
15 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|