|
"Calum Tsang" <tsangc@mie.utoronto.ca> wrote:
> One of the things you and Janey (and anyone else participating) will need
> to do
> is to sit down and figure out all the elevations. Derek did ours with a
> simple
> topo map:
>
> http://peach.mie.utoronto.ca/people/tsangc/nglcl/Contour-1.GIF
That would be a huge help for my contribution. DSg bluecore is producing
the Pulse Funitel and we need topo specs ASAP for tower design and terminal
concept feasability studies.
Over that span we're looking at ~150 p/h/d (people per hour per direction)
on a bi-directional single line system. That doubles of course with a
jigback but we're not sure if the visual impact will be acceptable to the
communities below (NIMBY). Do the demands at the top of Mount J warant a
larger capacity?
Iain
|
|
Message is in Reply To:
| | Re: Train Show
|
| (...) Yay! (...) The water is 1 brick thick, studs to the left. I have some small grey piers which hold the track up. I think this means I will need to start modifying my modules to have the track go out to the rest of the layout. (...) One of the (...) (20 years ago, 7-Mar-05, to lugnet.org.ca.rtltoronto, FTX)
|
6 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|