Michel Magnan wrote in message ...
> How many posts do we need? We could probably still use the GETS 2000 set,
> just add to them, I built 12.
12 seemed just enough for the last layout. For future layouts, I'd say
we'd need somewhere between 16-24.
> They are only 29.5 inches tall, which I
> thought was a bit short
Yes, it was a bit short, but if you have one rope and make it taller, then
small folks will sneak underneath. Suggestion: Run a second rope
through the middle of the poles in addition to the rope through the tops?
> The rope, (I can't find what we had at GETS 2000!) was from Canadian tire,
> white 1/4 or 5/16 inch in diameter very soft. They sold them in bags of 50
> feet, we may have to look at other options, but I really didn't like the
> yellow stiff rope they sold in bulk.
<snip>
> Several holes
> to run the electrical wires under the table, and out of reach. Let me know
> if I should nix this idea, before I start buying more materials!
I like the idea of hiding the wires out of the way, but right now
I can't recall what Steve is planning...
BTW, I don't have any buckets to spare for making poles, since the ones
I have currently serve as storage.
--
John
(remove the obvious to reply)
|
|
Message has 2 Replies:
Message is in Reply To:
116 Messages in This Thread: (Inline display suppressed due to large size. Click Dots below to view.)
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|