Subject:
|
Re: Show prep on Jan 13 (was Re: SuperTrain 2001 - I'll be there)
|
Newsgroups:
|
lugnet.org.ca.nalug
|
Date:
|
Sun, 31 Dec 2000 01:38:47 GMT
|
Viewed:
|
2783 times
|
| |
| |
In lugnet.org.ca.nalug, John Koob writes:
> Michel Magnan wrote in message ...
> > How many posts do we need? We could probably still use the GETS
> > 2000 set, just add to them, I built 12.
>
> 12 seemed just enough for the last layout. For future layouts,
> I'd say we'd need somewhere between 16-24.
I'm estimating 16 at this point, but the more the better.
> > They are only 29.5 inches tall, which I thought was a bit short
>
> Yes, it was a bit short, but if you have one rope and make it taller,
> then small folks will sneak underneath. Suggestion: Run a second rope
> through the middle of the poles in addition to the rope through the tops?
Good idea - rope isn't very expensive.
My Uncle has a small drill press for making the holes.
SRC
StRuCtures
|
|
Message has 1 Reply:
Message is in Reply To:
116 Messages in This Thread: (Inline display suppressed due to large size. Click Dots below to view.)
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|