To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trains.orgOpen lugnet.trains.org in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / Train Organizations / 123
  Re: Transitional piece construction
 
(...) I'm not 100% pure. So I would use sticker edges between rail joints to insulate. Or just mount the track one stud apart, that makes a fine gap. (...) Why? You just need two switches back to back, like so (bad ascii art) A2---\ (...) (25 years ago, 24-Aug-99, to lugnet.trains.org)
 
  Re: Transitional piece construction
 
(...) that will works but you will need 2 joint like that because when to train motor will cross over the joints both front and rear wheels are connected and will short-ciruit the 2 modules (also bad ascii art) A B ====~====~==== ^ ^ | | | | joint (...) (25 years ago, 25-Aug-99, to lugnet.trains.org)
 
  Re: Transitional piece construction
 
(...) Hi again, had a better idea you still need to make to insulated joint but at each joint you only need to put scoth tape on one side of the track: see the other ascii art trial | | A | | | = -> insulation | | | | | | middle section | | = |-> (...) (25 years ago, 25-Aug-99, to lugnet.trains.org)

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR