| | Re: If we are changing the Moonbase standards then why not... Aaron Sneary
|
| | (...) Mike, I think I see what you are getting at, but I think you are mistaken. You are refering to Minifigs required 5 bricks height for clearance, right? But if we raise the corridor height (that means the corridor floor) to 10 bricks high, that (...) (21 years ago, 2-Sep-03, to lugnet.space, FTX)
|
| | |
| | | | Re: If we are changing the Moonbase standards then why not... Mike Petrucelli
|
| | | | (...) A single plate thickness for a floor won't even come close to cutting it for the moonbase I plan on building. (URL) Really, I think 10 high intervals would be too limiting for people that want to make 2 levels in between corridor levels. Isn't (...) (21 years ago, 2-Sep-03, to lugnet.space, FTX)
|
| | | | |
| | | | | | Re: If we are changing the Moonbase standards then why not... Bram Lambrecht
|
| | | | (...) What about this? (URL) works in intervals of 10 bricks. --Bram (21 years ago, 2-Sep-03, to lugnet.space)
|
| | | | |
| | | | | | Re: If we are changing the Moonbase standards then why not... Mike Petrucelli
|
| | | | (...) Ah... So that is where the idea came from. Well I have to wonder if the potential benefits of making 12 high intervals and simply adding the neccesary bricks to the monorail stanchions (given most of the track would be on the modules anyways, (...) (21 years ago, 3-Sep-03, to lugnet.space, FTX)
|
| | | | |
| | | | | | Re: Monorail (was: If we are changing the Moonbase standards then why not...) Bram Lambrecht
|
| | | | (...) Exactly. I think the main reason there aren't more modules with connections for monorail is because there is no standard for adding it yet. A monorail adds a great deal of motion and interest for kids at a public display, Even though monorails (...) (21 years ago, 3-Sep-03, to lugnet.space)
|
| | | | |