| | Train Show Project Timeline - update
|
| (...) We've pretty much sorted out the layout, but I never heard back from Dick. I'll try him again. (...) Done, and we're working onwards from it. (...) Dean, what's your list of electronic doohickeys and status of each? Don't go crazy <g>. (...) (...) (24 years ago, 23-Oct-00, to lugnet.org.ca.vlc)
| | | | Re: Train Show Project Timeline - update
|
| (...) Train Crossing is kicking serious brick... Though I don't know the exact placing for the two tracks so I'll have to wing it... Also, I'm not sure if I have the needed 1by8 gray caps to bridge the gap between tracks. Kevin? The power supply (...) (24 years ago, 24-Oct-00, to lugnet.org.ca.vlc)
| | | | Re: Train Show Project Timeline - update
|
| (...) Yep, I have 26 of them (assuming you mean tiles). I'll try and remember not to use them somewhere else! (...) I have a fair number of tiles with Octan logos, a thin plastic Octan banner several inches long, and probably some Octan stickers. (...) (24 years ago, 24-Oct-00, to lugnet.org.ca.vlc)
| |