| | Re: I'm always asking questions regarding the layout...
|
|
(...) I thought we had 2 ascents and 2 descents: On the northern line, there's an ascent directly W of the bidge and a descent directly E of it: on teh southern line, there's an ascent W of the mountain and a descent E of the bridge. Both tracks are (...) (24 years ago, 31-Oct-00, to lugnet.org.ca.vlc)
|
|
| | Re: I'm always asking questions regarding the layout...
|
|
(...) Not short of ramps. We've spec'd out just 1 "ascent" and 1 "descent" in our layout, requiring two track pieces for each. I've got 2 "sets" of each so I'm covered. As far as the other control at the dock station, that's not a bad idea. I'll (...) (24 years ago, 31-Oct-00, to lugnet.org.ca.vlc)
|
|
| | Re: I'm always asking questions regarding the layout...
|
|
(...) OK. DId you say you were short of ramps, Robin? I can bring those if needed. It also strikes me that we need another directional control piece - at the m-station by the docks, BOTH sides of the loop ought to have a control switch so we can (...) (24 years ago, 31-Oct-00, to lugnet.org.ca.vlc)
|
|
| | Re: I'm always asking questions regarding the layout...
|
|
(...) Ditto on the monorail track for me. Also, I now have the 3 short directional control pieces needed for our layout, so Kevin won't need to help there. I'll provide all the monorail track and connectors. I've got lots of supports, but probably (...) (24 years ago, 31-Oct-00, to lugnet.org.ca.vlc)
|
|
| | More monorail info
|
|
Just a couple of points on the monorail track. We all know that the lower track level will have 12 full height supports underneath. For those that don't know it, the ramp simply raises this another 10 bricks, for a total support height (under the (...) (24 years ago, 31-Oct-00, to lugnet.org.ca.vlc)
|