To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.rtltorontoOpen lugnet.org.ca.rtltoronto in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / rtlToronto / *6249 (-10)
  Re: Train 4 Trainyard...
 
(...) It doesn't matter to me... this is a "rough" layout on my "mod": (URL) sure you can squeeze a switch there...and a "impromptu rail yard also" I'm not at all fussy. Ben (22 years ago, 15-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: rtlToronto, the Road Ahead to Winter 2002 and Spring 2003
 
First, good luck at this weekends show. Once you have recovered, I was wondering if you had decided about participating in the 2003 NMRA annual convention? Last year at the last minute the Florida LTC tried to get TLG to subsidize transportation for (...) (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4 Trainyard...
 
(...) Calum needed an extra, We have an open lot above the dam, and I believe Ben's modules were not quite to spec either. Here is a listing of the mods needed and to be supplied. Derek requires 02 Full modules Jeff E requires 02 Full modules, 2 (...) (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4 Trainyard...
 
(...) Then what I'll do is have a switch after the outside curve in SE corner, going on to my spare module (which I'll landscape et al), and set up the train yard/switches, which will proceed onto Matthias' modules... So the spare module will be (...) (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4 Trainyard...
 
(...) Since Matthias' modules aren't quite standard we'll use yours first, then fill in with Matthias' as needed. Matthias' need to be propped up by an inch to be level with standard modules. Derek (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4 Trainyard...
 
(...) That's Jeff--Mr. Planning Ahead guy... What's my spare module used for? I'm bringing 3 but only using 2. Just wonderin' Dave K (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4: Coming Soon
 
(...) Thanks Derek! Wow, that's some clearance--I'm going to have to redesign the outside landscaping. I'll get it done tonite. Dave K. (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4 Trainyard...
 
(...) My module is mostly full now, though I could throw in a switch to go onto Ben's Mod. It's up to Ben, then, to see if he wants to throw a rail yard on his mod or not. No worries eitehr way. We can just remove rolling stock as needed :) Dave K (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4 Trainyard...
 
(...) Actually we do have 4 extra thanks to Matthias, Only one of Matthais' mods were needed, I just wanted to have extra, in case we had a 'hey lets build a train yard moment' Jeff VW (...) (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 
  Re: Train 4: Coming Soon
 
(...) how sick you've been and how little time you've had. It's great. As for clearances on that curve. I think it's ok, but check: (URL) to be sure. This is only a requirement for the outside loop. I've been doing clearance on the inside loop by (...) (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR