| | Re: NXT software -- my view
|
|
(...) Why would I want an NXT? I hear you want one from Chris, though. Dave K (18 years ago, 18-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: Proposed Assembly Line Project
|
|
[And those dang Yankees just won't got back south of the border where they belong...] I like the idea of using the touch sensor, however it raise another question (that, not being at a meeting, I don't have an answer to). How are you proposing the (...) (18 years ago, 18-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: Proposed Assembly Line Project
|
|
[pardon the uninvited Yank, but I love the idea and have been lurking. And I'm hard to actually shut up, just ask Steve] (...) One thing you guys could consider is having different folks come up with different building sequences on their own, and (...) (18 years ago, 18-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: Proposed Assembly Line Project
|
|
(...) Waitwaitwait, did they build you at the Honda factory? :) I don't think we should worry about the minifig (but that's moot). (...) Not a dumb question at all - to be honest I hadn't thought about it. Once the "press down" starts happening I (...) (18 years ago, 18-Jan-07, to lugnet.org.ca.rtltoronto, FTX)
|
|
| | Re: Proposed Assembly Line Project
|
|
(...) There's a lot of prework for organizing: The carrier and the assembly pallet at minimum. Then deciding the building sequence. Thankfully the building sequence is pretty top to bottom. One item (the minifigure) needs to assembled before his (...) (18 years ago, 18-Jan-07, to lugnet.org.ca.rtltoronto, FTX)
|
|
| | Re: NXT software -- my view
|
|
(...) Well, if you look at pricing retail, yes. I personally think the NXT is worth much more than the RCX functionally too. We're just not used to it yet. Calum (18 years ago, 18-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: Proposed Assembly Line Project
|
|
(...) Bingo. :) I have a ton of old 4.5 V track I can loan out if people want to do it that way, but the new 9V track looks a lot nicer (there are twice as many cross ties on the 9V track than the old 4.5V). For mocking things up at home you could (...) (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) Do you really want more to just collect dust? (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: Proposed Assembly Line Project
|
|
(...) WOW, if only IAIN would update or modify his OTHER brickshelf accounts so that they could be modified for PUBLIC viewing. C (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: Proposed Assembly Line Project
|
|
(...) (snip) (...) Why the non electric stuff... Oh wait. i get it... if the RCX is used to feed power to the train wheels, then that same power is fed to the TRACK which would power the OTHER palets waiting or working. Duh. going back to whispering (...) (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) Ummmm Dave, Can i speak to you for a second.... ummm (whisper whisper) so thats why.... (whisper whisper) and while this may seem (whisper whisper) I just feel that (whisper whisper) so, that about means (whisper whisper) Chris (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) What kind if NXT? a pre production model or a MISB? what kind of RCX? (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) Better idea. I'll give you 1 NXT, you give me 3 RCXs. Steve (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) At least!! maybe 4!!! You bring 4 RCX's to the table, and I'll give you an NXT! Fair trade!! Dave K (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) So, you think those NXTs are worth THREE TIMES what the old RCXs are worth? I can see that. Steve (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
In lugnet.org.ca.rtltoronto, David Koudys wrote: <snip> (...) Oh, and they can't be the non AC adaptor ones, either--If I wanted that type of limitaiton, I might as well get an NXT... ;) Dave K (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) I'm Chris's broker--if you want 1 of his NXT's, you ship me 3 RCX's. They'll get to Chris... Honest! Dave K (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
(...) I think you math is messed up. You're saying the RCX is worth more than an NXT. And, you're saying 3 RCXs=1 NXT. That would seem to suggest 1 RCX = 1/3 NXT. So, which is it? Steve (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: NXT software -- my view
|
|
In lugnet.org.ca.rtltoronto, Steve Hassenplug wrote: <snip> (...) I personally believe that the RCX will 'win out' over the NXT for 'bot building in the long run, so the RCX is worth more... So at least a 3 for 1 trade--3 RCX's for 1 NXT. At least, (...) (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto)
|
|
| | Re: Proposed Assembly Line Project
|
|
(...) Well, I sort of imagined the layout of the entire thing would be more-or-less something like this: (URL) ...Where there's an initial "buffer" of free pallets, waiting to enter the system, and then you have them advancing into one of several (...) (18 years ago, 17-Jan-07, to lugnet.org.ca.rtltoronto, FTX)
|