To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 1602
  Re: Permanent outdoor train
 
(...) from PNLTC's show experience, I can attest that one can operate with loops of 90 feet or more using one set of track leads -- all with no noticeable drop in performance. Does this qualify as a "horse's mouth" answer? :) dan parker, PNLTC (25 years ago, 11-Jul-99, to lugnet.trains)
 
  Re: Permanent outdoor train
 
Dan Parker wrote in message ... (...) of (...) in (...) Hm, that's interesting, because I had noticed trains slowing down on the other side of my 4'x6' table. But maybe I'm imagining things, or maybe it's not level enough. Was that with a single (...) (25 years ago, 12-Jul-99, to lugnet.trains)
 
  Re: Permanent outdoor train
 
(...) I have to side with Frank on this one... run a 25 car train with 2 2 motor engines and you will see a speed drop on the far side of a 20 foot loop. (see my apt pictures to see the layout I'm talking about, it's not that big). Perhaps PNLTC is (...) (25 years ago, 12-Jul-99, to lugnet.trains)
 
  Re: Permanent outdoor train
 
In article <378946E9.C506EA83@v...ager.net>, Larry Pieniazek <lar@voyager.net> writes (...) Yes. My model railway experience was that multiple feeds work better. And with outdoor (semi)permanent track there are other factors, such as the (...) (25 years ago, 12-Jul-99, to lugnet.trains)

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR