To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trains.orgOpen lugnet.trains.org in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / Train Organizations / 1285
  Re: Trains Trains and Train Shows.
 
(...) Crawling under tables is possibly the best option, unless some hinger can be developed, but thats quite complicated, and I'm not sure how fancy our tabling arrangements may be. Bearing in mind that the lego cruves are fixed, providing a (...) (24 years ago, 8-Mar-01, to lugnet.trains.org)
 
  Re: Trains Trains and Train Shows.
 
(...) Based on advice from others here on large layouts, I laid-out our layout at Supertrain2001 with FIVE different controllers and speed zones. Where each section met mechanically, it was isolated electrically with two little pieces of black (...) (24 years ago, 13-Mar-01, to lugnet.trains.org)
 
  Re: Trains Trains and Train Shows.
 
(...) Steve is neglecting to mention that the zoning worked very well, and was a heck of a crowd pleaser, especially the 'high-speed' line down the front of the layout. The only thing I'd do differently next time is label the controllers. I was (...) (24 years ago, 13-Mar-01, to lugnet.trains.org)
 
  Re: Trains Trains and Train Shows.
 
(...) Heheh - I recall making a color-coded diagram that showed each zone and it's controller; Can't see to recall where it got to though... 8-) SRC L#765 (24 years ago, 16-Mar-01, to lugnet.trains.org)
 
  Re: Trains Trains and Train Shows.
 
(...) In the 7777 Idea book, they use colored 1x2 tiles to identify track power, as well as swicth-track controls and point-motors. :-) You can use colored tiles between the rails for track control, or 1x2 sloped bricks (back to back, beside the (...) (24 years ago, 19-Mar-01, to lugnet.trains.org)

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR