Subject:
|
Re: Packing the Mountain
|
Newsgroups:
|
lugnet.trains
|
Date:
|
Tue, 8 Feb 2005 17:21:37 GMT
|
Viewed:
|
1459 times
|
| |
| |
Brian,
Thanks for the photo documentry! I was wondering if you had time could you label
the table sizes? Maybe super impose the sizes on the image
(http://www.brickshelf.com/gallery/bdarrow/PackingMountain/packingb1.jpg). Did
you custom make the tables for this project or did your tables sorta dictate the
shape of the mountain scene?
SteveB
In lugnet.trains, Brian Darrow wrote:
> I took the mountain apart tonight and made some sequential pictures. Some of
> the boxes are a little snug so I use pieces of a cut up bed sheet to lower the
> sections in and lift them out. All total it's 17 boxes and 8 table sections. It
> took about two hours to pack it up carefully, but I think actual show teardown
> will go much quicker since it won't need to be so carefully packed and my
> IndyLUG friends always help me.
> http://www.brickshelf.com/cgi-bin/gallery.cgi?f=116274
> Brian Darrow
|
|
Message has 1 Reply: | | Re: Packing the Mountain
|
| Using this photo (sorry I don't know what program to use to overlay numbers) (URL) tables sizes (32x32 baseplate standard) are as follow: Level One - the first table (with the nuts and bolts) is 4x8, the table directly behind is 4x6 (we call these (...) (20 years ago, 8-Feb-05, to lugnet.trains)
|
Message is in Reply To:
| | Packing the Mountain
|
| I took the mountain apart tonight and made some sequential pictures. Some of the boxes are a little snug so I use pieces of a cut up bed sheet to lower the sections in and lift them out. All total it's 17 boxes and 8 table sections. It took about (...) (20 years ago, 8-Feb-05, to lugnet.trains)
|
5 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|