To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / *5895 (-5)
  Re: Yards
 
(...) It is actually possible, you just need to have the legs come in on a straight so you can make an electrical gap by leaving a 1 stud space between two pieces of track. (C) (A) ----\---...---x--/----- -> main -----\ /-----x-- || || / | (B) The (...) (25 years ago, 28-Apr-00, to lugnet.trains)
 
  Spline Cars
 
What is the general method of unloading spline cars as in this pic? (URL) (25 years ago, 28-Apr-00, to lugnet.trains)
 
  Re: Yards
 
Frank Filz wrote: <frank's excellent description sniiped for space> Thanks for your insights... I might try to make a wye. I think we may be able to get around some of the polarity issues because we use DCC to run our layout. And as I stated in my (...) (25 years ago, 28-Apr-00, to lugnet.trains, lugnet.org.us.wamalug)
 
  Re: Yards
 
Thanks for the ideas, I should be able to incorporate a lead of at least five feet into the layout plan without two much difficulty. -chris (...) (25 years ago, 28-Apr-00, to lugnet.trains, lugnet.org.us.wamalug)
 
  Mecanical Interlocking
 
Since reading some of the other peoples ideas (Thanks Dean!...I stole your track plan :) and so on, having been in the process of rebuilding the trackage on my layout anyway, I decided to make a signal box. The points are easy enough...first I have (...) (25 years ago, 28-Apr-00, to lugnet.trains)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR