| | Re: New Press Release about Power Function Trains
|
|
(...) Excellent idea, even if it means extending the battery by another two+ studs lengthwise. Another permutation to consider would be instead of recessing a half plate on each side, to make it a full plate thinner on both sides so that any surface (...) (17 years ago, 28-Mar-08, to lugnet.trains)
|
|
| | Re: New Press Release about Power Function Trains
|
|
(...) Here are my 2c on the entire thread thus far, I'm still concerned that the 4 wide battery is too wide to conceal in the hood of a 6 wide mode of a typical American road switcher (i.e., just about every American locomotive built since 1968). I (...) (17 years ago, 28-Mar-08, to lugnet.trains)
|
|
| | Re: New Press Release about Power Function Trains
|
|
(...) past, would it be possible to have a 4 stud wide footprint on the bottom and the have the rest of the side recessed similar to the headlight brick configuration.This will give the ability to build 6 wide hood units by providing a 4 x 8 plate (...) (17 years ago, 28-Mar-08, to lugnet.trains)
|
|
| | Re: New Press Release about Power Function Trains
|
|
Broken Record... I'm reading this great thread and can't help but think that if everyone reads the article for a level set, then we can talk about the next level of details. I am NOT trying to brag but I have been over to Denmark 2 times (with some (...) (17 years ago, 28-Mar-08, to lugnet.trains)
|
|
| | Re: New Press Release about Power Function Trains
|
|
For trains the Pf system does NOT require constant communication between the IR receiver and remote. And really how often do you control your trains at a train show. Currently most of us have only one train on a loop at a time at train shows, so you (...) (17 years ago, 27-Mar-08, to lugnet.trains)
|