| | Re: Transporting large setups.
|
|
PNLTC, I think, tears down and builds anew for each show (but they're on tables, except for a module or two) GMLTC has a custom trailer that takes custom racks mounted on large casters. The modules ride on custom lipped tables with folding legs and (...) (25 years ago, 27-Nov-99, to lugnet.trains)
|
|
| | Transporting large setups.
|
|
How do these clubs with the large setups transport them from one show to another? (25 years ago, 27-Nov-99, to lugnet.trains)
|
|
| | Re: Building Bridges
|
|
(...) I would love to see pictures of this? Do you have a website? Steve Martin (25 years ago, 27-Nov-99, to lugnet.trains)
|
|
| | Re: Remote Switches & GMLTC main lines
|
|
John N already answered but I will butt in too.. (...) I'm gonna go with "no". I know John said "yes" but from what I saw when running at shows, it was whatever people felt like running. The station in the corner doesn't really have a lot of (...) (25 years ago, 27-Nov-99, to lugnet.trains)
|
|
| | Re: Remote Switches & GMLTC main lines
|
|
(...) Yes. The third is a short mining loop in the quarry. (...) The passenger line runs along the outside of the layout. This leaves the freight line on the inside and able to freely access the roundhouse and freight yard. (...) Well, it's not (...) (25 years ago, 26-Nov-99, to lugnet.trains)
|