To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / *2057 (-5)
  Re: Transitional piece construction
 
(...) I'm not 100% pure. So I would use sticker edges between rail joints to insulate. Or just mount the track one stud apart, that makes a fine gap. (...) Why? You just need two switches back to back, like so (bad ascii art) A2---\ (...) (25 years ago, 24-Aug-99, to lugnet.trains.org)
 
  Re: Train doors and windows
 
(...) I'll agree that it sounds to good to be true, but I want to have my hopes dashed along with the rest of you. Which leads to the question: Is this hypothetical offer open to everyone, or just trainheads? James (URL) (25 years ago, 24-Aug-99, to lugnet.trains)
 
  Re: Train doors and windows
 
If something comes of this, probably makes sense to consolidate all the orders/requests/wishes into one. Either we do it independently or Christer does. Since I communicated with him offline about a much larger (3 orders of magnitude) request, I (...) (25 years ago, 24-Aug-99, to lugnet.trains)
 
  Transitional piece construction
 
How would you connect 2 different LTC layouts together when the way the transformers and therefore power distribution is different? If you did a straight connection then one group would control the others trains. The solution I thought of was to (...) (25 years ago, 24-Aug-99, to lugnet.trains.org)
 
  Re: Train doors and windows
 
(...) I am interested in the following. Sorry, but I don't know the part numbers. 1 pair of red train doors 2 pairs of black train doors 2 pairs of yellow train windows 2 pairs of black train windows Russell (25 years ago, 24-Aug-99, to lugnet.trains)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR