To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.roboticsOpen lugnet.robotics in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Robotics / 446 (+10)
  Re: MindStorms at Robot Store (Hacking Lego Compatible Parts)
 
In message <36493BCF.8BE4F5A8@projo.com>, Brian Stormont <brian@projo.com> writes (...) Has anyone taken apart the small yellow 2x2 connectors yet on the Cybermaster? It looks as if you might not be able to repair them. On my old 1092 TC-II, it was (...) (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: RCX Programming Questions and Sensor Ideas
 
In message <3648D155.FF4306@alu...ucsc.edu>, Joshua Delahunty <lugnet.robotics@lugnet.com> writes (...) RECEIVED is spelt wrong in the Spirit.OCX software too. :-) I would like to add though that I was impressed with the high quality of the manual. (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: MindStorms at Robot Store (Hacking Lego Compatible Parts)
 
In article <QqqhbWADlXS2EwhF@mk...on.co.uk>, CyberUser <CyberUser @mksftwre.demon.co.uk> writes (...) Dunno about the cybermaster, but the wire links with black 4x4 connectors are very bad. Anyone who has visited Legoland Windsor will know a very (...) (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: RCX Programming Questions and Sensor Ideas
 
(...) Oops. I don't know how the scheduler in the RCX works. It might execute 1 opcode from each task in order. If 2 tasks get in sync, then they will never leave the semaphore code as written. Here's a fixed version. I added a random backoff. (...) (...) (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: RCX Programming Questions and Sensor Ideas
 
(...) Paul, Are you sure you want to sleep before decrementing r31? As written, r31 is always >= 1 during the sleep -- which prevents any other tasks from obtaining a lock on the resource during this sleep time. In other words, once any two tasks (...) (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: RCX Programming Questions and Sensor Ideas
 
(...) I think "oops" applies in this case. Your fix looks correct. (...) It doesn't have to be random, just each task needs a different delay. This is easy, since each task has to run its own version of the code. For task 3 insert 3 noops, for task (...) (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: Ultrasonic Radar
 
(...) Polaroid manufactures the 6500 series ultrasonic ranging system that can be purchased in single quantities for less than $50 US, but it can't be directly connected to the RCX. (See (URL) for ordering. See ftp://wirz.com/Polar...r/6500.PDF for (...) (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  What about multiplexing sensors?
 
Has anyone attempted to mux the three sensor connections to expand the RCX's sensor capability? Think this is possible? I don't have an RCX of my own [yet] nor the EE capacity to pull this off, so I'm counting on the geniuses out there! --Steve (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: MindStorms at Robot Store (Hacking Lego Compatible Parts)
 
I have some black ones as well, I think its for colour coding - yellow for sensors, black for third motor. I think I prefer the old grey cable as its more flexible. Perhaps the stiff thin black cable is supposed to last longer. On the Cybermaster (...) (28 years ago, 11-Nov-98, to lugnet.robotics)
 
  Re: RCX Programming Questions and Sensor Ideas
 
(...) Does that support an arbitrary number of tasks? If there are n tasks numbered 1 to n, and task k delays for k cycles on failure, I think you still have to be careful to make sure that the number of tasks n is smaller than the loop overhead h (...) (28 years ago, 11-Nov-98, to lugnet.robotics)

Next Page:  5 more | 10 more | 20 more
Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR