 | | Re: Discontinuous motion.
|
|
Bill, This exact same question was posted several months ago but I don't remember the sollution that they came to. This is my Idea: Ok you take two pulleys, pulley (A) is smaller then pulley (B). You then conect the 2 pulleys via a linkage so that (...) (25 years ago, 2-Apr-02, to lugnet.robotics)
|
| |
 | | Rcx Question And Radio Controlled.
|
|
Hi again. I was wondering ?? Can the Rcx be Controlled off the pc via the rcx ? or the Nqc program ? If so how can I boost the range I want to be able to controll the rcx while I am in side the house but yet the robot will be OUT SIDE the house. I (...) (25 years ago, 2-Apr-02, to lugnet.robotics)
|
| |
 | | MoTeC March: Vote now!
|
|
FUT lugnet.technic Hi all! New month and time to vote for the best Technic MOC in the Monthly Technic Contest - MoTeC. Vote here: (URL) you want to submit your own model for April, read here: (URL) months winner will be announced shortly. /Tobbe (...) (25 years ago, 2-Apr-02, to lugnet.announce, lugnet.build.contests, lugnet.robotics, lugnet.modelteam, lugnet.technic)
|
| |
 | | Re: Discontinuous motion.
|
|
Great reference, thanks Bill. I had forgotten about the Geneva mechanism. Any interest, Steve? If you'd consider filing the teeth off a gear, how about an honest to goodness made to measure couple of Geneva mechanism parts? JB (...) (25 years ago, 2-Apr-02, to lugnet.robotics)
|
| |
 | | RE: Discontinuous motion.
|
|
Try looking at the mechanisms at (URL) find this to be a great reference site for basic kinematics. bill -----Original Message----- From: Steve Baker [mailto:sjbaker1@airmail.net] Sent: Saturday, April 06, 2002 12:07 AM To: Lego Robotics Subject: (...) (25 years ago, 2-Apr-02, to lugnet.robotics)
|
| |
 | | Re: USB Tower Software without RIS2.0 install
|
|
The USB tower on my desk has a small tag near the plug which states "Do not plug the USB-tower before the RIS 2.0 CD-rom is installed." And the box arrived with a yellow slip of paper with the same instructions. I do understand the RIS 2.0 SDK (...) (25 years ago, 2-Apr-02, to lugnet.robotics)
|
| |
 | | Re: USB Tower Software without RIS2.0 install
|
|
(...) Why so complicated? Just plug in the tower, reboot, Windows will ask for a driver, point it to the CD, voila. Actually this is the procedure recommended by LEGO _before_ installing RIS, so you just skip that second step. Jürgen (25 years ago, 2-Apr-02, to lugnet.robotics)
|
| |
 | | Re: AFOL new to LUGNET - many MOCs
|
|
Hi Kevin Congratulations, I'm really impressed. Many good ideas, and clever mechanical implementations. And you also documented most of your creations with MLCAD instructions! I love the electro-pneumatic adding machine. Keep up the good work! Mario (...) (25 years ago, 2-Apr-02, to lugnet.robotics)
|
| |
 | | USB Tower Software without RIS2.0 install
|
|
(...) Just run "ReinstallUsbTower.exe" from the CD or copy all files that begin with ltower plus "ReinstallUsbTower.exe" and "TowerApi.dll" to another location (< 350K) and run Reinstall. You do not have to load the remaining RIS2.0 software. -- (...) (25 years ago, 30-Mar-02, to lugnet.robotics)
|
| |
 | | Re: LeJos threads / sleep() takes too long
|
|
The priority mechanism used in lejos is the same as that specified in the Real Time Specification for Java (RTSJ): Threads of a higher priority will absolutely block threads of a lower priority as long as they remain runnable. The sensor listener (...) (25 years ago, 1-Apr-02, to lugnet.robotics.rcx.java)
|