Subject:
|
Re: Expansion of our Train Layout...
|
Newsgroups:
|
lugnet.org.us.nelug
|
Date:
|
Wed, 20 Dec 2000 00:16:26 GMT
|
Viewed:
|
631 times
|
| |
| |
In lugnet.org.us.nelug, Eric Kingsley writes:
> After the meeting last night I think the concensus was that we would like to
> expand the layout by 1 table length (Add 2 tables) for the next event and then
> possibly a similar expansion after that. Because of this I am going to
> submit our application for the next show with layout dimensions of 10'x15'
> which is a little long but thats OK. We can worry about getting the track and
> baseplates later but I thought we should decide which direction to expand the
> layout in.
>
> Greenberg would prefer that one of the dimensions stayed in the 10 foot range.
> This means that once we pick a direction of expansion we are going to live with
> it unless we redesign the layout totally.
>
> For referance here is the current layout.
>
> http://www.nelug.org/layout/
>
> I guess my suggestion is to expand on the Alphabetic axis rather than the
> numeric axis for a couple reasons.
>
> 1. We can extend Main Street to allow for more businesses and local government
> facilities like a police station, city hall, court house etc.
>
> 2. It gives us an area to expand/create a switching yard. The 2 spurs in this
> layout were packed at the last show and I would like things more spread out to
> display rolling stock. This is also a good area for industry and maybe a
> public works facility.
>
>
> The only other thing I would like to fix is the one place where we have curved
> track crossing a road in the upper right of the layout. This shouldn't be too
> hard. This just makes it easier to add a crossing eventually.
>
> Anyway in my free time I will work on this but if others have ideas or
> differences in oppinion about the direction of expansion please let me know.
>
>
> Eric Kingsley
>
> The New England LEGO Users Group
> http://www.nelug.org/
That seems fine. I think we do need more space for rolling stock, and a
switching yard would be excellent.
Eric, I know you are working on a police station, does any one else plan to
work on any specific buildings? I think that if anyone is going to work on a
specific kind of building, it might be a good idea to post it here, so we
don't have a bunch of the same type of buildings. As for me, I will be
trying to create a gas station, and maybe a crane for the switching yard.3
Tom D
|
|
Message is in Reply To:
| | Expansion of our Train Layout...
|
| After the meeting last night I think the concensus was that we would like to expand the layout by 1 table length (Add 2 tables) for the next event and then possibly a similar expansion after that. Because of this I am going to submit our application (...) (24 years ago, 19-Dec-00, to lugnet.org.us.nelug)
|
2 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|