To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.us.nelugOpen lugnet.org.us.nelug in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / United States / NELUG / 1176
1175  |  1177
Subject: 
Re: Expansion of our Train Layout...
Newsgroups: 
lugnet.org.us.nelug
Date: 
Wed, 20 Dec 2000 00:16:26 GMT
Viewed: 
2246 times
  
In lugnet.org.us.nelug, Eric Kingsley writes:
> After the meeting last night I think the concensus was that we would like to
> expand the layout by 1 table length (Add 2 tables) for the next event and then
> possibly a similar expansion after that.  Because of this I am going to
> submit our application for the next show with layout dimensions of 10'x15'
> which is a little long but thats OK.  We can worry about getting the track and
> baseplates later but I thought we should decide which direction to expand the
> layout in.
> 
> Greenberg would prefer that one of the dimensions stayed in the 10 foot range.
> This means that once we pick a direction of expansion we are going to live with
> it unless we redesign the layout totally.
> 
> For referance here is the current layout.
> 
> http://www.nelug.org/layout/
> 
> I guess my suggestion is to expand on the Alphabetic axis rather than the
> numeric axis for a couple reasons.
> 
> 1.  We can extend Main Street to allow for more businesses and local government
> facilities like a police station, city hall, court house etc.
> 
> 2.  It gives us an area to expand/create a switching yard.  The 2 spurs in this
> layout were packed at the last show and I would like things more spread out to
> display rolling stock.  This is also a good area for industry and maybe a
> public works facility.
> 
> 
> The only other thing I would like to fix is the one place where we have curved
> track crossing a road in the upper right of the layout.  This shouldn't be too
> hard.  This just makes it easier to add a crossing eventually.
> 
> Anyway in my free time I will work on this but if others have ideas or
> differences in oppinion about the direction of expansion please let me know.
> 
> 
> Eric Kingsley
> 
> The New England LEGO Users Group
> http://www.nelug.org/

That seems fine. I think we do need more space for rolling stock, and a
switching yard would be excellent.
Eric, I know you are working on a police station, does any one else plan to
work on any specific buildings? I think that if anyone is going to work on a
specific kind of building, it might be a good idea to post it here, so we
don't have a bunch of the same type of buildings. As for me, I will be
trying to create a gas station, and maybe a crane for the switching yard.3


Tom D



Message is in Reply To:
  Expansion of our Train Layout...
 
After the meeting last night I think the concensus was that we would like to expand the layout by 1 table length (Add 2 tables) for the next event and then possibly a similar expansion after that. Because of this I am going to submit our application (...) (26 years ago, 19-Dec-00, to lugnet.org.us.nelug)

2 Messages in This Thread:

Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR