To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.us.michlugOpen lugnet.org.us.michlug in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / United States / MichLUG / *2124 (-5)
  Re: Mountain Layout
 
(...) I guess I am left without much choice as to waiting. I really don't think I can start until I have the footprint of the tracks determined. I just was eager to start construction ASAP so I can budget pieces for it. With the new car, and a new (...) (25 years ago, 27-Aug-01, to lugnet.org.us.michlug)
 
  Re: Mountain Layout
 
(...) Jason, we are still a long way till i get a layout size from GATS.I think the best thing to do is do a straight line through it along with one next to it.Having the monorail go through it would be good to but until i get a layout going i'm not (...) (25 years ago, 27-Aug-01, to lugnet.org.us.michlug)
 
  Re: Mountain Layout
 
(...) I destroyed everything I had for the GR show. I have all new stuff now so that means you can put it where ever. Tony (25 years ago, 27-Aug-01, to lugnet.org.us.michlug)
 
  Re: Mountain Layout
 
Jason, Well, I guess the best thing to do is to figure out a few things: 1) Our size for Novi 2) What additions are we adding to the layout 3) What would be a good place, corner, etc. It would be a good topic to talk about at the meeting, one week (...) (25 years ago, 27-Aug-01, to lugnet.org.us.michlug)
 
  Re: Mountain Layout
 
(...) I have two buildings on the water side so I’m hoping for a larger water side this time. Saying that, my thoughts are to have one side facing water with two tracks. One going though and one track on the outside of the mountain. You could also (...) (25 years ago, 27-Aug-01, to lugnet.org.us.michlug)

Next Page:  5 more | 10 more | 20 more
Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR