| | Re: "Core" layout features for rtlTrainN
|
|
(...) <snip> (...) Yes, this had occured to me as well. Minimum # of modules is 11 to get this effect with a figure-8 though, and that's a lot for the amount of "core" comittment we're getting. (...) <snip> (...) A number of my designs revolve (...) (22 years ago, 22-Jul-02, to lugnet.org.ca.rtltoronto)
|
|
| | Re: "Core" layout features for rtlTrainN
|
|
(...) Currently I have the 6 modules that I had at T3, as well as the new module that I have been working on (and almost finished). calum was mentioning that his train station would consist of 3 modules, so that is 10 right there (2 of which are (...) (22 years ago, 22-Jul-02, to lugnet.org.ca.rtltoronto)
|
|
| | Re: "Core" layout features for rtlTrainN
|
|
(...) I have 3 & 2/2, and Derek has 1 & 2/2 But I'm not sure everyone could bring all their modules... which is why I was asking for input on who was up for being "core". I sort of assumed that anyone who replied with a "for sure I'll be there with (...) (22 years ago, 22-Jul-02, to lugnet.org.ca.rtltoronto)
|
|
| | Re: "Core" layout features for rtlTrainN
|
|
(...) I have 3 fully made modules, and 3 modules that have to be put together. I'll design my layout to suit whatever the layout needs. Dave K. (I'd like to have room for my fire station, but it's a wee bit big so I can drop it if I have to.) (22 years ago, 23-Jul-02, to lugnet.org.ca.rtltoronto)
|