| | Re: Train Show David Koudys
|
| | (URL) So here's an already quick update--Janey and Iain are contributing to the lower run and Janey's already hard at work on the upper loop. So basically there are 2-3 modules for stuff--on each side of the lift bridge. The module attaching to the (...) (20 years ago, 7-Mar-05, to lugnet.org.ca.rtltoronto, FTX)
|
| | |
| | | | Re: Train Show Calum Tsang
|
| | | | (...) Yay! (...) The water is 1 brick thick, studs to the left. I have some small grey piers which hold the track up. I think this means I will need to start modifying my modules to have the track go out to the rest of the layout. (...) One of the (...) (20 years ago, 7-Mar-05, to lugnet.org.ca.rtltoronto, FTX)
|
| | | | |
| | | | | | Re: Train Show David Koudys
|
| | | | | (...) <snip> THe thing with the lift bridges is I needed at least 3 bricks 'above ground (the baseplate) to achieve a satisfactory lifting mechanism. We may have to get the track to rise a few plates from the 'old layout' to the lift bridge (...) (20 years ago, 7-Mar-05, to lugnet.org.ca.rtltoronto, FTX)
|
| | | | | |
| | | | | | Re: Train Show Iain Hendry
|
| | | | (...) the Pulse Funitel and we need topo specs ASAP for tower design and terminal concept feasability studies. Over that span we're looking at ~150 p/h/d (people per hour per direction) on a bi-directional single line system. That doubles of course (...) (20 years ago, 8-Mar-05, to lugnet.org.ca.rtltoronto)
|
| | | | |