 | | It's 2:55AM
|
|
And I finished building my robot. Now to make the software work... Calum (21 years ago, 3-Mar-06, to lugnet.org.ca.rtltoronto)
|
| |
 | | Re: Gear lash....
|
|
(...) No, that made a lot of sense. I get it. I looked at Dave's code--that helped too. (...) I've never used them. I don't really know why one would. I've always used those little 2x2 round pads. I've got a couple worn down by a millimeter which is (...) (21 years ago, 3-Mar-06, to lugnet.org.ca.rtltoronto)
|
| |
 | | Re: Gear lash....
|
|
(...) If I may comment on the castor issue. 1. Never put rubber tires on casters. 2. Use that funny boat hull piece as a caster whenever possible 3. Never put rubber tires on casters. The hole issue with casters messing up your direction control (...) (21 years ago, 3-Mar-06, to lugnet.org.ca.rtltoronto, FTX)
|
| |
 | | Re: Gear lash....
|
|
(...) One reason the sampling time can be high is a misguided attempt to "smooth" the times. I tried averaging out the last five values in a shift register and found it really slowed the thing down (my samples got really "steppy"). I switched to (...) (21 years ago, 3-Mar-06, to lugnet.org.ca.rtltoronto, FTX)
|
| |
 | | The blocks are ready!
|
|
(URL) I am not. I've tried but I've had so little time in the last few weeks the best I've done is build 100 blocks. I'm still working on a bot but realistically it's not going to happen. But I'll still be there with the full set of game blocks. (...) (21 years ago, 3-Mar-06, to lugnet.org.ca.rtltoronto)
|