| | Re: SuperTrain 2001 layout latest
|
|
Here's a close-up of mountain spacing, with the "incline corner-stone reference" highlighted. I moved the "industrial loop" closer in to (URL) mountain because this way the mountain and loop have a 4'x10' table area. Let's the mountain spread out (...) (24 years ago, 24-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 layout latest
|
|
(...) track segment by itself is the "show circle" for BigRed if Kevin can get those CP stickers ready in the next three weeks... 8-) SRC (24 years ago, 24-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 layout latest
|
|
(...) Show circle? Unless Kevin has some objection, I intend to run that sucker! :) James (24 years ago, 25-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 layout latest
|
|
(...) Whoops! I didn't pay enough attention the first time around... The baseplates should be lined up with the inside, not with the outside of the tracks, if that makes sense - there's an extra 8 studs of baseplate on the outside of this: (TD (...) (24 years ago, 25-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 layout latest
|
|
(...) Just overlap the baseplates to give the result you want. As long as it fits on a 4'x10' table and the tracks are where they're supposed to be, the baseplates etc. are irrelevant (to me). :-) SRC (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 layout latest
|
|
(...) Ok. You do know that it won't fill a 4x10 table in either dimension, right? James (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 layout mountain sizing
|
|
(...) Yup - Just didn't want it hangin' over the edge. :-) Any luck finding a grey cloth to give the illusion of the mountain extending up from the floor? That reminds me - How many of those $2 blue table cloths did Michel leave at your place? I (...) (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 layout mountain sizing
|
|
(...) Cool. :) (...) Can do - although not in a fireproof varient, if they're wanting such. (...) I only have 1, unless they're hiding somewhere clever. I'll e-mail him and ask him to bring them in when he drops stuff off on the 7th. James (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
|
|
| | Re: SuperTrain 2001 skirt
|
|
I left the 10 packs of white plastic skirting at my parents with the other two blue ones, hopefully I'll have time to dash to Millwoods to pick them up before I go to Sherwood Park to drop off the rest of the stuff. Michel (...) ask (...) (24 years ago, 27-Jan-01, to lugnet.org.ca.nalug)
|