To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.nalugOpen lugnet.org.ca.nalug in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / NALUG / *539 (-10)
  Re: SuperTrain 2001 layout latest - Jan25
 
Excellent. Great yard. I can't find much to change. :-] If we will be short on straight track, no problem--I am in need of some anyway and could be convinced to place an order. LMK. John SRC wrote in message ... (...) (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest - Jan25
 
OK - I've got the layout design basically done. Here's what it looks like: (URL) a closer view of the industrial side. Moving clockwise, there is the switching yard, container yard, auto yard, and fuel yard. Michel's cool spring-loaded track ends (...) (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout mountain sizing
 
(...) Yup - Just didn't want it hangin' over the edge. :-) Any luck finding a grey cloth to give the illusion of the mountain extending up from the floor? That reminds me - How many of those $2 blue table cloths did Michel leave at your place? I (...) (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest
 
(...) Ok. You do know that it won't fill a 4x10 table in either dimension, right? James (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest
 
(...) Just overlap the baseplates to give the result you want. As long as it fits on a 4'x10' table and the tracks are where they're supposed to be, the baseplates etc. are irrelevant (to me). :-) SRC (24 years ago, 26-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest
 
(...) Whoops! I didn't pay enough attention the first time around... The baseplates should be lined up with the inside, not with the outside of the tracks, if that makes sense - there's an extra 8 studs of baseplate on the outside of this: (TD (...) (24 years ago, 25-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest
 
(...) Show circle? Unless Kevin has some objection, I intend to run that sucker! :) James (24 years ago, 25-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest
 
(...) track segment by itself is the "show circle" for BigRed if Kevin can get those CP stickers ready in the next three weeks... 8-) SRC (24 years ago, 24-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest
 
Here's a close-up of mountain spacing, with the "incline corner-stone reference" highlighted. I moved the "industrial loop" closer in to (URL) mountain because this way the mountain and loop have a 4'x10' table area. Let's the mountain spread out (...) (24 years ago, 24-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout latest
 
This is the overall view with us in the middle of the whole show... (URL) is a 3D view of the tables, though it's not done yet... (URL) here is a screen shot of the layout so far... (URL) will be adding/changing the town on the far right hand side, (...) (24 years ago, 24-Jan-01, to lugnet.org.ca.nalug)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR