|
| | Re: Fright Force on sale at TRU
|
| (...) The bad guys should always outnumber the good guys. (25 years ago, 18-Jun-99, to lugnet.market.shopping, lugnet.loc.us.mn.msp)
| | | | So Long, Minneapolis! So Long, GMLTC!
|
| It has been a lot of fun. Made some good friends, saw some amazing things, learned a lot, taught a little. I plan to visit twice in July, once for the wedding and once for the NMRA convention. Who can say when I'll be back but it's very possible... (...) (25 years ago, 18-Jun-99, to lugnet.loc.us.mn.msp, lugnet.trains.org)
| | | | Re: Fright Force on sale at TRU
|
| Mike Timm wrote in message <376be487.3950549@Lu...et.com>... (...) I've been seeing the Fright Knights sets on this sale at TRU since at least April. I probably need to pick up a few more, though if I'm not carefull, my Fright Knight army will be (...) (25 years ago, 18-Jun-99, to lugnet.market.shopping, lugnet.loc.us.mn.msp)
| | | | Fright Force on sale at TRU
|
| As the title above states, 6031 Fright Force is on clearance at TRU for $2.97. They also had the 6007 Bat Lord for the same price as well as the 6716 Weapons Wagon and 6706 Frontier Patrol. I know that the Wild West sets have commonly been reported (...) (25 years ago, 19-Jun-99, to lugnet.market.shopping, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| Paul Foster wrote: > (...) Yes, unless one built some sort of "wye" module, all the modules in use must form a single closed loop (in the meta sense) to allow continuous running. (25 years ago, 7-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) But you still have to have an even number of modules, right? So "A" module under construction will only replace one of Conan's modules until another module can be paired with it? (25 years ago, 7-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) Oops. Yeah, well, waddya expect-- I'm just a rookie...d:-) -J2 (...) (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) understand the (...) *each* (...) studs in (...) John, you've got that backwards. 4 studs to the outside track, 2 studs between the tracks. (And 20 bricks + 1 plate above the baseplates! <grin>) <much more snipped> J1 (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) Naa. Neither approach is **better**. They are just different. (...) Sure. To do a PNLTC module base takes some wood, some paint, some hardware. 100 bucks at most, and that's no doubt high. Then there is the track itself, as well as the (...) (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) Actually, yes the track pops out at exactly the same place on every module, 2 studs in for the outside loop, and another 4 studs in after that for the second loop. (...) Well, they don't *have* to, it's just much easier that way. If y'all are (...) (25 years ago, 5-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| |