|
Zonker,
Count me in as a train theme day supporter. I will try to have an actual
loop done by in modules then, but my work will be increasing greatly when
our harvest season comes (110 hour weeks) and I have about 2 1/2 weeks of
bulding time before harvest. If possible, I will be bringing 3 finished
modules instead of the 80% done one I brought.
As far as timeline is concerned, the later, the better and a saturday would
normally be best, although I would not be opposed to a Sunday meeting (most
likely to be off of work). Hopefully, I can make this next one, but if not,
I would hate to miss a train theme. Maybe have another theme in November
and trains in February would be better. By then, I should have not only the
modules done, but also my new table system (fold down legs, built in power
strips - super fast setup) and possibly even have the full 5 module town
section done. (I will be a little short on buildings, though).
Please bring a tazer to zap kids who pull trains off the tracks and for
parents who don't seem to care.
Mike
|
|
Message has 1 Reply:
Message is in Reply To:
6 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|