|
NELUG just concluded the 04/06 - 04/07 Greenberg train show. This was our most
ambitious layout to date. Features included an amusement park with 5 working
rides plus a static roller coaster, WWII trains, a huge down-town area, and
much much more.
Some other little details include Spiderman chasing the Green Goblin, a Rock
Monster attack, a large fire, a Timmy holdup, a chick stealing a piece of
chicken, Jar-Jar fishing, and a train running on a train. I am sure there is a
lot more if you look closely enough as well.
http://www.nelug.org/greenberg0402/
The bonus footage is from a small NETCA show from 03/24. This was a one day
show with less than 2 hours of setup. We set up a small layout with 5 of our
standard tables and a loop of track. The biggest accomplishment here is that
from the time we pulled up to the door until we had a working layout was 1 1/2
hours.
You may also notice the "where's Waldo" of LEGO train clubs in several pictures
as well. Let's just call it "where's Larry".
http://www.nelug.org/netca032402/
Eric Kingsley
--
The New England LEGO Users Group
http://www.nelug.org/
|
|
Message has 4 Replies:
8 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|