| | Re: BRICKFEST MOONBASE (follow-up count) William R. Ward
|
| | (...) David Wegmuller worked out a standard last summer that I think should be adopted. See (URL) and the ensuing thread. --Bill. (21 years ago, 5-Jun-03, to lugnet.events.brickfest, lugnet.space, FTX)
|
| | |
| | | | Moonbase Monorail standards (was: BRICKFEST MOONBASE) Tony Hafner
|
| | | | (...) We used that standard at NWBrickCon and it worked great. The example picture he gaved essentially used a 8-stud grid that has track lying along borders between bases. But that particular example aimed to keep most straight lines on the 16-stud (...) (21 years ago, 5-Jun-03, to lugnet.events.brickfest, lugnet.space)
|
| | | | |
| | | | | | Re: Moonbase Monorail standards (was: BRICKFEST MOONBASE) Frank Filz
|
| | | | (...) Oops, sorry about that, you're right. The point I think I was making though is that David Wegmuller's standard is actually more strict than really necessary. The reality is that most of the track we laid was in different positions. I agree (...) (21 years ago, 6-Jun-03, to lugnet.events.brickfest, lugnet.space)
|
| | | | |
| | | | | | Re: Moonbase Monorail standards (was: BRICKFEST MOONBASE) Frank Filz
|
| | | | (...) One thing I'll add - since a huge collection is not necessary, I won't plan on bringing lots of track, however, I may decide to bring along my bag of 8 stud track lengths since depending on just how large a track collection we have, they may (...) (21 years ago, 6-Jun-03, to lugnet.events.brickfest, lugnet.space)
|
| | | | |