Subject:
|
Re: New MOC - Giant cable-stayed bridge
|
Newsgroups:
|
lugnet.build
|
Date:
|
Mon, 9 May 2005 03:50:26 GMT
|
Viewed:
|
4389 times
|
| |
| |
In lugnet.build, Felix Greco wrote:
|
In lugnet.build, Duane Collicott wrote:
|
Greetings.
This is a scale model of the Maumee River Crossing bridge, a cable-stayed
bridge currently under construction in Toledo, Ohio, USA.
|
The pictures dont do it justice. It was pretty impressive live.
|
Ill say.
I dont think Ive EVER seen a MOC so big that it shaded other MOCs!
|
|
Message has 1 Reply: | | Re: New MOC - Giant cable-stayed bridge
|
| (...) It was amazing - since I was right next to him during the build, it was fun to watch too. Other than my one tall GBC module, we could have run most of the GBC right under it in its shadow, with plenty of room left over. (20 years ago, 9-May-05, to lugnet.build, FTX)
|
Message is in Reply To:
23 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|