To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.buildOpen lugnet.build in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Building / 15952
15951  |  15953
Subject: 
Re: New MOC - Giant cable-stayed bridge
Newsgroups: 
lugnet.build
Date: 
Mon, 9 May 2005 03:50:26 GMT
Viewed: 
4389 times
  
In lugnet.build, Felix Greco wrote:
   In lugnet.build, Duane Collicott wrote:
   Greetings.

This is a scale model of the Maumee River Crossing bridge, a cable-stayed bridge currently under construction in Toledo, Ohio, USA.

The pictures don’t do it justice. It was pretty impressive live.

I’ll say.

I don’t think I’ve EVER seen a MOC so big that it “shaded” other MOCs!



Message has 1 Reply:
  Re: New MOC - Giant cable-stayed bridge
 
(...) It was amazing - since I was right next to him during the build, it was fun to watch too. Other than my one tall GBC module, we could have run most of the GBC right under it in its shadow, with plenty of room left over. (20 years ago, 9-May-05, to lugnet.build, FTX)

Message is in Reply To:
  Re: New MOC - Giant cable-stayed bridge
 
(...) The pictures don't do it justice. It was pretty impressive live. (20 years ago, 9-May-05, to lugnet.build, FTX)

23 Messages in This Thread:








Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact

This Message and its Replies on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR