Subject:
|
Re: New MOC - Giant cable-stayed bridge
|
Newsgroups:
|
lugnet.build
|
Date:
|
Thu, 5 May 2005 18:32:53 GMT
|
Viewed:
|
4395 times
|
| |
| |
In lugnet.build, Duane Collicott wrote:
|
In this picture it is only 70 percent complete (14 of 20 cables), and
measures 9.5 feet long (2.9 meters).
|
Duane-
Well, weve still got you for the moment. Ours is 384 studs long, which is
slightly over 10 feet.
Nice job! Looking forward to seeing the completed work.
-Ted
|
|
Message has 3 Replies: | | Re: New MOC - Giant cable-stayed bridge
|
| (...) Oooh - a "mine is bigger than yours" contest! (Sorry, couldn't resist!). The design is different, but at our latest GETS show, NALUG's Laszlo Szojka showed a 17-foot bridge using a similar cable technique: (URL) quite the classic cable-stay (...) (20 years ago, 6-May-05, to lugnet.build)
|
Message is in Reply To:
| | New MOC - Giant cable-stayed bridge
|
| Greetings. This is a scale model of the Maumee River Crossing bridge, a cable-stayed bridge currently under construction in Toledo, Ohio, USA. In this picture it is only 70 percent complete (14 of 20 cables), and measures 9.5 feet long (2.9 meters). (...) (20 years ago, 5-May-05, to lugnet.build, lugnet.announce.moc, FTX) !!
|
23 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|