To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.buildOpen lugnet.build in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Building / 15935
15934  |  15936
Subject: 
Re: New MOC - Giant cable-stayed bridge
Newsgroups: 
lugnet.build
Date: 
Thu, 5 May 2005 19:48:06 GMT
Viewed: 
7162 times
  
In lugnet.build, Duane Collicott wrote:
   Greetings.

This is a scale model of the Maumee River Crossing bridge, a cable-stayed bridge currently under construction in Toledo, Ohio, USA.

In this picture it is only 70 percent complete (14 of 20 cables), and measures 9.5 feet long (2.9 meters). When completed, it will be 13.5 feet long (4.1 meters). The main pylon will reach 4.5 feet high (1.4 meters). The roadbed is 52 studs wide, and ranges from 0.3 bricks thick (a plate) to 3.7 bricks thick (three bricks and two plates). All pieces are LEGO(r) except for the cables, which are nylon string.

There are 11,110 parts in the main span, and probably another 500 or so in the main pylon.

This bridge is part of my educational LEGO(r) work. More info on that is at my Web site, http://www.BricksForBrains.com

Enjoy!



So you’re the genious who made it! Very nice! I’ve was looking at the pics you have up on BrickShelf a few days ago and been wondering about it.

Gotta few q’s-

About the roadway: will it be tiles or schleim’ed?

Will you be posting more pics of the deck construction? A closer view of the ends would be nice.

Thanks,

Adr.



Message has 1 Reply:
  Re: New MOC - Giant cable-stayed bridge
 
(...) Thank you for the kind words. I started pricing tiles for the roadway, and it looked like it was getting into several hunderd dollars, so I shelved that idea. You'll have to fill me in on what "schleim’ed" means! I dind't get any other pics, (...) (20 years ago, 5-May-05, to lugnet.build, FTX)

Message is in Reply To:
  New MOC - Giant cable-stayed bridge
 
Greetings. This is a scale model of the Maumee River Crossing bridge, a cable-stayed bridge currently under construction in Toledo, Ohio, USA. In this picture it is only 70 percent complete (14 of 20 cables), and measures 9.5 feet long (2.9 meters). (...) (20 years ago, 5-May-05, to lugnet.build, lugnet.announce.moc, FTX) !! 

23 Messages in This Thread:








Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact

This Message and its Replies on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR