 | | Re: Nominations for a trainset poll
|
|
(...) As Tim alludes, one set probably would do... I'd go further and say, supply the loose piece sets to build both the construction trains (supply flats, dormitory cars, equipment flats with horse drawn graders on board etc) as well as the (...) (21 years ago, 5-May-05, to lugnet.trains)
|
| |
 | | Re: Layout roads
|
|
(...) Not to mention cheaper labor costs! And BTW: you can't really dust for vomit! ;-) FUT.fun JOHN (21 years ago, 5-May-05, to lugnet.org.us.lucny, FTX)
|
| |
 | | Re: Nominations for a trainset poll
|
|
(...) I was looking at it more from the perspective of "collectible" playability. I assume you could do it either way. I would think the PPP(1) would be lower if you packaged the Golden Spike in one box as a set. Throw in some straight track and (...) (21 years ago, 5-May-05, to lugnet.trains)
|
| |
 | | Re: Help with redesigning a Boat Lock
|
|
(...) Thanks to this advice, I've got a pretty good idea how we can fix the lift lock, but I'll throw somethign together at home tonite to test... THen I'l bring it to dinner next Friday Dave K (21 years ago, 5-May-05, to lugnet.technic)
|
| |
 | | Re: Layout roads
|
|
(...) Well, it IS cheaper than weathering paint! And more prototypical. (21 years ago, 5-May-05, to lugnet.org.us.lucny, FTX)
|