To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.announceOpen lugnet.announce in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Announcements / 3542
3541  |  3543
Subject: 
Robo Quad - Stage Eight
Newsgroups: 
lugnet.announce, lugnet.technic, lugnet.robotics, lugnet.build.mecha
Followup-To: 
lugnet.technic, lugnet.robotics
Date: 
Sun, 3 Jun 2007 20:26:45 GMT
Highlighted: 
(details)
Viewed: 
35186 times
  
Robo Quad - Stage Eight completed

Robo Quad - Stage One notes
Robo Quad - Stage Two and Three notes
Robo Quad - Stage Four and Five notes
Robo Quad - Stage Six notes
Robo Quad - Stage Seven notes
Robo Quad - Stage Eight completed
Robo Quad - Stage Nine Work in Progress
Robo Quad - Main Gallery

Pilot added. Head construction completed. Tail construction completed.

Stage Eight Goals:
  • Complete sides of the neck.
  • Complete head design.
  • Add cockpit for pilot.
  • Begin tail articulation.
Mouse over thumbs for descriptions...

Pilot

Pilot overhead canopy Robo Quad head - front view Robot Mini Figure Pilot 9v Lights in pilot’s cockpit

Tail Mechanics

Tail construction - Stud less interlinks Tail wave generator Tail stabilizer Tail uses dozens of stud less components to create the wagging effect

Robo Quad - Stage Eight completed

Robo Quad Stage Eight - Completed

Tail Lift

Robo Quad Stage Seven prior to adding the tail Tail lift mechanics Tail lift mechanics fit into the cavity between the rear legs Tail lift mechanics prior to mounting

Robo Quad Stage Nine Goals
  • Finalize wire routing.
  • Install RC motor mux. (HiTechnic)
  • Mount power box onto rear section. (Motor Mux)
  • Final detail.

Robo Quad - Stage Nine Work in Progress
Robo Quad - Main Gallery



Eric Sophie



1 Message in This Thread:

Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR