| | Re: SCLTC enters final two weeks at SDMRRM; Pictures!
|
|
(...) photos snipped (...) The layout looks great again this year, but man, that's a convoluted track plan. I heard rumor while I was there that the museum was interested in possibly establishing a permanent home for a LEGO layout. Any progress in (...) (19 years ago, 4-Jan-06, to lugnet.trains.org.scltc, FTX)
|
|
| | Re: SCLTC enters final two weeks at SDMRRM; Pictures!
|
|
(...) .. Eric- Thanks for the comments. The cable-stayed bridge was built as two 60-inch spans that we can separate if desired. For this display, we modified them so that their decks can tilt relative to their towers. This allows each bridge to (...) (19 years ago, 4-Jan-06, to lugnet.trains.org.scltc)
|
|
| | Re: SCLTC enters final two weeks at SDMRRM; Pictures!
|
|
Awesome display! When I think SCLTC, I think of great layouts like this! Hey cool, I didn't know (you had or there were) two of those white cable span bridges. Amazing. Happy New Year BTW. Thanks for putting these pictures up. e (19 years ago, 4-Jan-06, to lugnet.trains.org.scltc)
|
|
| | SCLTC enters final two weeks at SDMRRM; Pictures!
|
|
SCLTC's annual winter show at the (URL) San Diego Model Railroad Museum> is now in its final two weeks! (10 URLs) This batch of layout pictures is posted (URL). -Ted Michon SCLTC (19 years ago, 3-Jan-06, to lugnet.announce, lugnet.trains, lugnet.trains.org.scltc, lugnet.town, lugnet.general, FTX) !!
|
|
| | Re: ILTCO layout at the NMRA 2006 National Train Show in Philly
|
|
There has been many questions sent in so I decided that I would answer them in this post for all to read. Sorry if this gets to your inbox more than once, once the mailing lists are in place there will be no more ILTCO NMRA NTS spam! Please send me (...) (19 years ago, 31-Dec-05, to lugnet.events, lugnet.general, lugnet.announce, lugnet.loc.us.pa, lugnet.trains, lugnet.trains.org)
|