| | Re: Thanks PNWLTC/dp
|
| (...) How does the PNWLTC transport the modules/rolling stock/etc to the shows that they do? How long does it take to set up a large display? (26 years ago, 3-Apr-99, to lugnet.trains)
| | | | Re: show setup (wasThanks PNWLTC/dp
|
| Hi Paul, the short answer to the setup question is that, at least for all current members, everything is broken down and packed in boxes or stacked; no modules are transported as a setup affair. What follows is the long answer. I'll also try to (...) (26 years ago, 7-Apr-99, to lugnet.trains)
| | | | Re: show setup (wasThanks PNWLTC/dp
|
| (...) Contrast that (and thanks for the long description) with the GMLTC. Thanks to the core member whose stuff all of it is, there is a custom trailer that can hold modules and folded up tables. Each module stays in the trailer between shows (...) (26 years ago, 9-Apr-99, to lugnet.trains)
| |