To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 6027
    Re: New Plasticity layout - a challenge —Andreas Stabno
   (...) to the problem [1]. "Before" and "after" images are posted at the link above. Now my new question for all of you multi control experts: Where do the speed controllers need to be attached to control multiple loops as well as the switching yard? (...) (25 years ago, 26-May-00, to lugnet.trains)
   
        Re: New Plasticity layout - a challenge —James Powell
    (...) 3 controllers, plus one for switching yard (optional), with aditional connection to the outside left track after the point (if that makes sense) James (25 years ago, 26-May-00, to lugnet.trains)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR