To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 25886
    new switch designs...... help needed! —Ondrew Hartigan
   Hey all, While at the NMRA show this past July I was talking with a few people about the custom switches I make and I was given a challenge. In short the challenge was to make these: (URL) Now that I have some free time I would like to take on this (...) (19 years ago, 14-Sep-05, to lugnet.trains, FTX)  
   
        Re: new switch designs...... help needed! —Ross Crawford
   (...) The double-Y will be difficult to do with both switches at the same position. You'd have to have some way to ensure both aren't set to reverse (curved) at the same time, and a reliable way to direct the train when both are normal (straight). (...) (19 years ago, 14-Sep-05, to lugnet.trains, FTX)
   
        Re: new switch designs...... help needed! —Ondrew Hartigan
   (...) you make a good point. i should be able to use a 4 or 8 stud offset with little or no huge problems. either way i think it's going to be fun which is what matters anyway. ondrew (19 years ago, 14-Sep-05, to lugnet.trains, FTX)
   
        Re: new switch designs...... help needed! —Scott Lyttle
     (...) Just thinking out loud here.. maybe consider a 16-stud offset (1 track length), primarily because it would be easier to join your track with, and not need a cut track to mate up with a 4 or 8 stud offset. it would make your double Y 48 studs (...) (19 years ago, 14-Sep-05, to lugnet.trains, FTX)
   
        Re: new switch designs...... help needed! —Mark Bellis
     (...) Ondrew, I see you have a single slip at 45 degrees there. I remember seeing a 22.5 degree crossing someone made from 2 straights, so that if two tracks were 32 studs apart with a switch on each and a straight connecting them, another track (...) (19 years ago, 14-Sep-05, to lugnet.trains, FTX)
   
        Re: new switch designs...... help needed! —Tim David
   (...) I was checking out a real three way point (switch) while waiting for the train home. The one in question has quite a large offset. However I don't think you need to worry about having both points set for the outside roads at the same time as (...) (19 years ago, 14-Sep-05, to lugnet.trains, FTX)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR